200X Pressure reducing valve is mostly used in water supply and drainage and water conservancy pipeline system, with the core function of pressure reduction and stabilization. The outlet pressure can be stabilized, the inlet pressure fluctuation can be offset and the back-end pipeline and water consuming equipment can be protected by adjusting the opening of the valve hoist. The valve shall be installed horizontally, and standard commissioning is the key to guarantee the pressure stabilization effect.

200X Pressure reducing valve relies on automatic regulation of downstream pressure to balance pipeline pressure. It is applicable to municipal water supply, fire fighting, industrial water treatment and other situations, and can avoid pipeline damage and equipment failure caused by high pressure.

Standard commissioning steps: after installation of pipes and valves, close the inlet and outlet gate valves. First, close the needle valve clockwise and fully open the pilot valve counterclockwise. Second, open the inlet gate valve and rotate the needle valve counterclockwise for one and a half circles; Open the tail gate valve for pressure relief when the values of inlet and outlet pressure gauges are the same, and close the outlet after the pressure returns to zero. Third, adjust the pilot valve clockwise one by one and keep it for 30 seconds after each rotation. Continue to fine tune after the pressure becomes stable until the set pressure is reached. Finally, lock the fixing bolts and complete the commissioning.

Correct commissioning can keep stable and stable performance of 200X pilot pressure relief valve, reduce pressure fluctuation, leakage and failure of pressure stabilization, guarantee long-term safe operation of pipeline system and meet the use requirements of various water conservancy and water supply and drainage projects.

Scroll to Top